Skip links
Jon Lewis, Oxford Street London

Sisley

Working drawings produced and all units Manufactured and installed in an 8 - 12-week period.

The Brief.

Manufacture and install new counters and wall displays in the above location. To include all material sampling and working drawings for brand approvals. All materials as per brand pallet. All lighting LED with low voltage control gear

Scope.

Sequence.

Questions? You’re covered.

Yes — we operate nationwide and manage everything from design to installation in-house, ensuring consistent quality wherever the project is based.

Absolutely. We handle CAD drawings, material sampling, approvals, joinery, CNC, painting, metalwork, and installation — all under one roof.

It begins with a conversation. Share your brief with us, and our team will guide you through the process — from concept to completion.

Full Project Gallery

Explore
Drag